Home » Photo of the Day » New Bridge

New Bridge

by: April 19, 2013 11:29 am Category: Photo of the Day A+ / A-

19bridgewebA heavy duty backhoe digs the Cagayan de Oro river in preparation for the construction of another bridge on April 18, 2013. The bridge, which is estimated to cost at least P200 million, will be constructed in two years. MindaNews photo by Froilan Gallardo

New Bridge Reviewed by on . A heavy duty backhoe digs the Cagayan de Oro river in preparation for the construction of another bridge on April 18, 2013. The bridge, which is estimated to co A heavy duty backhoe digs the Cagayan de Oro river in preparation for the construction of another bridge on April 18, 2013. The bridge, which is estimated to co Rating: